In Piping Plan 61 there are tapped and plugged atmospheric-side connections for purchaser’s use.
In Piping Plan 61, all ports are plugged with plastic plugs at the time of shipment. At instaliation, the user shall connect tubing to the drain port and direct leakage to a collection point. This plan may also be specified if the purchaser may use these ports in the future.